A Ellery company - serving Pasadena, CA
Ellery ADU Studio Pasadena adu team

ADU Design & Permitting in Burbank - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU in Burbank, CA

Junior ADU & Interior Conversion in Burbank typically runs $85,000-$165,000 all-in, drawings through final inspection, with most projects permitted through Burbank’s Planning & Building Division in 90-120 days. ADU Site Prep & Utilities adds $15,000-$45,000 depending on whether your postwar bungalow needs a 100-amp-to-200-amp panel upgrade through Burbank Water and Power. Call (626) 427-9813 and we’ll schedule your free estimate with a written price before any work starts.

Call (626) 427-9813

Burbank’s 1940s-to-1960s housing stock makes Junior ADU & Interior Conversion one of our most called-about services here. These postwar stucco bungalows sit on 6,000-7,500 sq ft lots with existing footprints that often convert more cleanly than owners expect, though the original wiring, asbestos in roofing and drywall, and BWP’s separate electrical queue add steps that contractors from neighboring cities routinely miss.

Why Burbank Homes Are Different

Burbank sits deep in the inland San Fernando Valley, where summer highs of 100-108°F run 10 to 15 degrees above coastal LA. That gap changes everything about HVAC sizing for ADU mini-splits; we specify higher cooling loads here than for identical square footage in Santa Monica or Culver City.

The housing stock is remarkably consistent: postwar stucco bungalows, 900-1,400 sq ft, built 1940-1965, with detached single-car garages that are the most common conversion target. These garages almost always need panel upgrades, asbestos assessment, and rewiring before they’re habitable. Properties on the Verdugo Mountain foothill edges fall within high fire hazard severity zones, triggering additional defensible-space and ember-resistant construction requirements. South of Hollywood Burbank Airport, around Empire Avenue, noise insulation standards require upgraded windows and wall assemblies that add cost a mile north would not.

And Burbank Water and Power is its own municipal utility, not LADWP or SoCal Edison. Every electrical service upgrade, new meter, and interconnection runs through BWP’s separate scheduling, fee schedule, and inspection queue. Contractors who build across city lines in Glendale or North Hollywood consistently underestimate this distinction.

Our Main Burbank Services

These are the three services Burbank homeowners call about most, each with its own detailed Burbank page.

ADU Design & Permitting in Burbank

We produce the full permit set, structural calculations, and Title 24 energy compliance as a standalone deliverable or as the first phase of a design-build contract. In Burbank, this means navigating BWP’s separate electrical review, fire hazard severity zone requirements for foothill properties, and airport noise zone insulation standards south of Empire Avenue. ADU Design & Permitting in Burbank covers the full scope.

ADU Design & Permitting in Burbank

Garage Conversion ADU in Burbank

The detached single-car garages common in Burbank’s postwar neighborhoods are our most frequent conversion target. Almost all need asbestos assessment of original roofing and drywall, 100-amp-to-200-amp panel upgrades through BWP, and re-routing of early postwar wiring before permitting. We handle each step under one contract at one written price. Garage Conversion ADU in Burbank has the full breakdown.

Garage Conversion ADU in Burbank

New Detached ADU in Burbank

For homeowners with usable rear yard space on these 6,000-7,500 sq ft lots, a new detached unit offers the most rental income potential. Foothill properties require defensible-space planning and ember-resistant exterior finishes. We coordinate prefab systems from Abodu or Cover within the same single contract. New Detached ADU in Burbank covers siting, sizing, and pricing.

New Detached ADU in Burbank
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (626) 427-9813

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Junior ADU & Interior Conversion in Burbank

Contractor applying spray foam insulation for garage conversion ADU project
Junior ADU & Interior Conversion in Burbank

Junior ADU & Interior Conversion in Burbank converts existing square footage within the main house, attached garage, or basement into a self-contained unit with its own kitchenette and exterior entrance. Burbank’s postwar bungalows offer surprising opportunities here: the original floor plans often include underutilized back bedrooms, enclosed porches, or partial basements that convert cleanly once asbestos and wiring are addressed. The 100-108°F summer highs make proper mini-split sizing critical, and BWP’s separate electrical queue means panel upgrades for these units need early scheduling. We handle Junior ADU & Interior Conversion as a single contract from measured drawings through final inspection.

Room-to-ADU Conversion

Signs you need it

You have a back bedroom, den, or enclosed porch with exterior wall access that sits unused while you’re paying full mortgage on a house you bought between 2015 and 2025.

What it costs in Burbank

Room-to-ADU conversions in Burbank typically run $85,000-$135,000 all-in, including asbestos assessment, electrical panel upgrade through BWP, and Title 24 compliance.

How we do it

We measure existing conditions, produce the permit set with BWP electrical specifications, remove and remediate asbestos-containing materials if present, rewire to 200-amp service, install the kitchenette and mini-split, and pass final inspection with a documented photo record at each visit.

Interior JADU

Signs you need it

You need a separate living unit for family or rental income but your lot coverage or setback doesn’t allow a detached ADU, or you want to preserve yard space.

What it costs in Burbank

Interior JADUs in Burbank typically run $75,000-$125,000 all-in, with lower utility tie-in costs than detached units but the same BWP electrical upgrade requirements.

How we do it

We identify the smallest viable footprint within your existing layout, design the kitchenette and exterior entrance to code, produce the JADU-specific permit set, coordinate BWP electrical review, and build to the permitted drawings under our 365-Day Done Right Promise.

What Junior ADU & Interior Conversion Costs in Burbank

Item Typical range in Burbank
Room-to-ADU conversion, all-in $85,000-$135,000
Interior JADU, all-in $75,000-$125,000
Above-garage ADU, all-in $110,000-$165,000

Does a Junior ADU need its own electrical meter in Burbank?

No, a JADU can share the main home’s meter under state law, though many Burbank owners opt for a separate BWP meter to simplify rental billing. Call (626) 427-9813 and we’ll walk through which setup fits your project.

Can I convert a basement to an ADU in Burbank?

Partial basements in Burbank’s postwar stock can convert if ceiling height meets 7’6″ minimum and egress windows comply with current code. We assess this in our first site visit and document findings with photos.

ADU Site Prep & Utilities in Burbank

Two professionals reviewing ADU floor plans and construction documents
ADU Site Prep & Utilities in Burbank

ADU Site Prep & Utilities in Burbank addresses the pre-construction work that determines whether your project stays on schedule or stalls at the first inspection. Burbank’s postwar housing stock means nearly every garage conversion and many interior conversions need electrical panel upgrades through BWP’s separate queue, not LADWP’s. The 100-108°F inland heat also drives higher HVAC electrical loads, making 200-amp service the practical minimum for most ADUs here. We coordinate ADU Site Prep & Utilities as an integrated scope within your design-build contract, not a surprise add-on.

Electrical Panel Upgrade

Signs you need it

Your existing panel is 100 amps, your main breaker trips when the AC runs, or BWP requires service upgrade for the new ADU meter.

What it costs in Burbank

Electrical panel upgrades through BWP in Burbank typically run $8,000-$15,000 including the new 200-amp panel, BWP coordination, and inspection.

How we do it

We submit BWP’s service request, schedule the disconnect and reconnect, install the new panel and grounding system, and coordinate BWP’s inspection before rough electrical begins.

Foundation & Grading

Signs you need it

Your garage slab is cracked, sloped, or less than 4 inches thick, or you’re building a new detached ADU on a sloped lot in the Verdugo foothills.

What it costs in Burbank

Foundation and grading work in Burbank typically runs $12,000-$28,000 for garage slab replacement or new stem-wall foundations on moderate slopes.

How we do it

We test existing slab thickness and soil bearing, design the replacement or new foundation to Burbank’s seismic and hillside codes, and pour with documented slump and rebar placement photos.

What ADU Site Prep & Utilities Costs in Burbank

Item Typical range in Burbank
Electrical panel upgrade (BWP) $8,000-$15,000
Foundation & grading $12,000-$28,000
Plumbing lateral extension $4,500-$9,000

How long does BWP take to approve an electrical upgrade?

BWP’s service upgrade queue typically runs 3-6 weeks from application to scheduling, longer than LADWP in neighboring areas. We submit immediately upon contract signing to keep your project on track.

Is asbestos always found in Burbank garage conversions?

Not always, but pre-1980 roofing and drywall in Burbank’s postwar stock tests positive often enough that we budget for assessment and remediation in every quote. You’ll know the exact cost before work starts, per Haven Standard Clause 1.

Get the price in writing before anything starts.Serving Burbank - a real person answers, day or night.
Call now

Brands We Service in Burbank

We specify and coordinate prefab and modular systems from Abodu, Cover, Dvele, and James Hardie within our single-contract design-build model. Parts and finish samples are stocked locally through our Los Angeles office, with typical turnaround of 48 hours for specification questions or replacement orders. See our brands for the full list.

Pricing for ADU in Burbank, CA

Designer and client reviewing ADU architectural design plans on a computer
Pricing for ADU in Burbank, CA
Service Typical range in Burbank
Room-to-ADU conversion $85,000-$135,000
Interior JADU $75,000-$125,000
Above-garage ADU $110,000-$165,000
Electrical panel upgrade (BWP) $8,000-$15,000
Foundation & grading $12,000-$28,000
Plumbing lateral extension $4,500-$9,000
Gas line extension $3,500-$7,500
Landscaping & hardscape (post-build) $5,000-$18,000

Prices push higher in Burbank when properties fall within the Verdugo foothill fire hazard zones or the airport noise impact zone south of Empire Avenue, both triggering additional code requirements. Every project is quoted with a written price before any work begins, per Haven Standard Clause 1; no change orders, no door-side upsells.

Neighborhoods We Serve in Burbank

We work across Burbank’s full residential footprint, from the flat postwar neighborhoods near Victory Boulevard to the hillside streets below Verdugo Mountains. Crews are dispatched from our Los Angeles office with typical response time of same-day or next-day for site visits.

  • Media District
  • Magnolia Park
  • Rancho Adjacent
  • Burbank Hills
  • McNeil

Service Area - Cities Near Burbank

Contractor presenting 3D ADU architectural design to a client
Service Area - Cities Near Burbank

Our crews serve the full San Fernando Valley and adjacent communities. Homeowners in Glendale, CA face different utility coordination through LADWP and Glendale Water & Power. North Hollywood, CA has its own postwar stock but LADWP electrical service. Pasadena, CA requires Pasadena Water & Power coordination and stricter historic district review in some neighborhoods. Alhambra, CA sits in a different permit jurisdiction with distinct setback calculations.

Serving Burbank, CA - Our Local Coverage Area

We’re based in the Burbank area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in Burbank

Contractors building metal stud frame for a garage conversion ADU project
FAQs About ADU in Burbank

Ready to get started? Free estimates · Written quotes before work starts response in Burbank
Call (626) 427-9813

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Burbank Customers Say

★★★★★ 5.0 from 3+ reviews

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."

- Benedict H.

How It Works in Burbank

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Burbank - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Request a Free Estimate

Tell us what's going on in Burbank - we'll get back to you fast. No obligation.

By submitting this form, you acknowledge our Privacy Policy and agree that you may be contacted by call, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Us
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch